New capabilities, practical improvements and clear availability notes.
· Connections
Connect your company’s BILL account.
Owners can connect a BILL organization with API access and review incoming vendors, customers, bills, invoices and payment status.
Enable incoming updates every 15 minutes, review records and confirm possible matches with your connected QuickBooks company. Source IDs keep repeat updates on the same record.
BILL records have their own review register. They do not create project costs, WIP entries or duplicate QBO transactions. Provider documents and payments remain managed in BILL.
Project Dashboard and Projects Closed now separate time from contract signing, actual work start and administrative closure.
Record actual work dates and an original schedule in Project Closeout. Compare actual completion with both the original finish and the current project schedule. Date corrections require a reason and remain in history.
Closed-project statistics show average durations and on-time completion with eligible-project counts. Missing dates and cancelled projects do not distort the averages. All durations are calendar days, including pauses.
During Android testing, the mobile Time screen supports Clock In and Add Manual Time without a project in every selected company, including My Company.
Choose No project / test time. Switching to Demo or changing the company category is not required. The mobile field screen in a browser has the same behavior.
Time without a project is saved for review and does not add project labor costs. Employee access, project permissions and time validation still apply. Desktop project requirements remain as configured, with the existing Test and Demo exception.
The private Demo Company now includes inspections and closeout, every scheduling category, filled forms, licenses and permits, fleet records and time-off requests.
A separate public works example includes published Sacramento taper rates, two fictional workers, regular and overtime hours, benefit contributions and unsigned A-1-131 samples for a fixed historical period. No payroll is filed or paid.
Switch into Demo to add these examples while preserving existing sample edits. New and reset demos include them automatically. Your own company stays separate.
Company owners can switch between their company and a separate demonstration workspace with connected fictional construction records.
Explore contracts, bids, Budget vs. Actual, WIP, progress and standard invoices, missing billing, retainage, payments, approvals, reimbursements, time cards, materials and tools.
Demo edits stay in your private sample company. External delivery, integrations and public sharing are disabled. Reset Demo restores the sample records without changing your own company.
Each company Owner or assigned Admin can give employees individual Materials & Tools permissions for receiving, stock movements, catalog work, purchase orders and prices.
Use Company & Team → Warehouse Access. For warehouse-only staff, create a company role with the Field Team base profile, invite the employee and assign inventory permissions after they join.
PMs remain limited to their assigned projects. Permissions apply to Materials & Tools; other base-profile access is unchanged. Changes end the affected employee’s sessions and are recorded in the audit log.
Automatic item codes. Multiple labels on one sheet.
New catalog items receive a permanent internal code automatically. Print mixed items and multiple copies on Letter label sheets, starting at any unused cell.
Keep supplier barcodes and custom SKUs alongside the internal code. Blank SKUs default to the generated code. Existing items receive an internal code on their next saved edit.
Choose 30 small or 10 large labels per Letter sheet, or a 50 × 30 mm roll label. Preview first and print at 100% with headers and footers off. Match the exact label dimensions; test your printer alignment on plain paper.
Scan items. Follow stock from warehouse to project.
Find catalog items by barcode or exact SKU, scan with a supported browser camera, and print QR item labels. Track material usage separately from project deliveries.
USB/Bluetooth readers and manual entry are supported. Camera scanning requires permission and a compatible HTTPS browser; verify it on your device. Scanning selects an item and never saves a movement automatically.
Receive stock, issue it to an assigned project, record Use on Project, and return unused quantities. Reverse Usage keeps a correction reason and cannot exceed recorded usage. Physical stock changes do not automatically post WIP costs or QBO entries.
A new short home-page video shows how project schedules, purchasing, billing and job-cost visibility fit together. The full walkthrough is still available.
Select the short overview or the complete project walkthrough in the same compact video block. English captions are available.
The mobile field workflow shown in the short video is labeled coming soon. Illustrations use sample data.
What’s New brings product updates together. Scheduled maintenance notices appear on open pages, and supported workspace record editors keep a recovery draft in the current browser tab.
Recovery drafts cover the main workspace record editor. They are not submitted business records; restore, review and save them explicitly. File attachments must be selected again.
Other forms keep their existing save behavior. Save before leaving or refreshing. Maintenance does not automatically reload your page.
· QuickBooks
Import transactions on your terms.
Choose a month, quarter, year or custom date range. Preview a document type and confirm the records you want to bring into ECS Finek.
Optionally include older unpaid bills or invoices. Payment imports show linked documents, including those outside your selected period.
Existing records are retained. Manual imports do not change your automatic sync settings.